金凤凰彩

      <noframes id="lbrlt"><form id="lbrlt"></form>

              <noframes id="lbrlt">
                <strike id="lbrlt"><span id="lbrlt"><track id="lbrlt"></track></span></strike>

                  3" Icedrill

                  Movie: Ice core drilling at the Jungfraujoch (from the Paul Scherrer Institute)

                   

                  Svalbart:

                   March 2009



                  Colle Gniffeti:

                   September 2003



                   

                  Piz Zuppo:

                  March 2002

                   

                  Drilling at Illimani (6400 masl).

                  25th Mai - 6th June 1999
                   

                  Two 3 Inch Ice Core Drills at base camp

                  Two baseplates on the way to Illimani

                  Two 3 Inch Ice Core Drills at Illimani

                  View into the Ice Cap of Illimani

                  Drillhead after contact to bedrock
                   

                   

                   

                  Drill tests at the Jungfraujoch:

                  1998


                  Drill with Tent for Protection against sun, wind and snow (tent is a extra option).

                  Drill with Shadow Sail



                  2" Icedrill

                   Drilling at the Aletsch glacier:

                  Test of the surface sample drill in temperated ice.
                  This drill is basically the 2" drill with a simplyfied drive.

                   

                  Drilling in the Glaciere de la Molesi:

                  Ice core recovered from a ice cave in the
                  swiss jura.

                  Poor core quality due to a lot of stones in the ice.

                   

                  Test at the Jungfraujoch:


                  Complete drill with transportation protection

                  Put the drill together

                  Check the clutch

                  Check the cutting ring

                  Drilling

                  Break the core

                  Open the clutch

                  Remove the icecore

                  Seperate the chips barrel

                  Remove the drillchips


                  Drilltent:

                   
                  Erection at Lomosonovfonna (Svalbart)
                  the 03/22/2009

                  Ambient temperature below -20°C

                  Start time 16.10
                  End time 17.20

                  03/22/2009 16.17

                  16.18

                  16.26

                  16.27

                  16.50

                  17.00

                  17.01

                   

                  17.25

                   

                   

                   

                    

                   

                   

                   

                   

                   At the Jungfraujoch:    

                   

                   

                   

                   

                   

                   

                   

                   

                   

                   

                   

                  Home
                   

                  d.stampfli
                  Copyright © 2010 www.zzssd.com.cn AG.
                  Date: 07/20/10
                      <noframes id="lbrlt"><form id="lbrlt"></form>

                              <noframes id="lbrlt">
                                <strike id="lbrlt"><span id="lbrlt"><track id="lbrlt"></track></span></strike>

                                  culture

                                  Application Essentials

                                  Finance

                                  video

                                  game

                                  aviation

                                  Application Essentials

                                  Mobile phone

                                  city